A connected process
Map inlet and outlet elevations before choosing a transfer arrangement. Conveying distance, incline and material behavior affect the configuration.
- 01
Upstream interface
- 02
Material transfer
- 03
Screening
- 04
Downstream interface
Plan around your site
Provide the current layout, available space, inlet and outlet heights and production schedule. Identify constraints that cannot change, such as existing support structures or downstream packaging equipment.
Define the expected result
List the target fractions, expected throughput and acceptance method. Include the characteristics of the actual material and any variations during normal operation.
Read the project checklist ↗Illustrative process concept, not a completed customer project. Final equipment and sequence depend on application review.
DISCUSS YOUR APPLICATION