A connected process
Start with the incoming size distribution and define each required output fraction. Consider wear, feed variability and access for maintenance.
- 01
Feed reception
- 02
Even distribution
- 03
Size classification
- 04
Fraction collection
Plan around your site
Provide the current layout, available space, inlet and outlet heights and production schedule. Identify constraints that cannot change, such as existing support structures or downstream packaging equipment.
Define the expected result
List the target fractions, expected throughput and acceptance method. Include the characteristics of the actual material and any variations during normal operation.
Read the project checklist ↗Illustrative process concept, not a completed customer project. Final equipment and sequence depend on application review.
DISCUSS YOUR APPLICATION